CIE S.A
July 2023 - November 2023
Process Survey: Led the exhaustive survey of industrial processes, identifying areas for improvement and opportunities to increase operational efficiency dealing with over 80 operators in the plant. Results Analysis and Solution Design: Through detailed data analysis, I proposed innovative solutions to solve operational challenges, thus optimizing manufacturing schedules and improving the quality of the final product. Accompaniment in Testing and Quality Control: I actively collaborated in surface tests and quality tests, ensuring that the products met the rigorous standards of the industry. I conducted a comprehensive analysis of process times for welding, assembly, and finishing tasks. Utilizing data from the CAST system, I meticulously analyzed operators' time allocations, identifying opportunities for streamlining production. As part of my recommendations for enhancing productivity, I proposed the acquisition of a coil unwinder for a warehouse construction project, projecting a cost reduction of $70,000 USD per vessel in terms of raw material and direct labor time. This initiative significantly contributed to operational efficiency and cost savings within the company's manufacturing processes, demonstrating my ability to drive positive impact through data-driven insights and strategic recommendations. During my internship, I not only gained hands-on experience, but also left a positive mark by introducing significant changes that contributed to the operational success of the metallurgical company.